An International Energy and Environmental Engineering Consulting Group
710 Lunalilo St., Suite 1107, Honolulu, HI  96813, USA  Phone: (808) 282-5594
Rezachek & Associates
Seawater Air Conditioning
Ocean Thermal Energy Conversion
Wave Energy
Solar Thermal
Photovoltaics
Wind Energy
Hydroelectric
Biomass and Alternative Fuels
Electric and Hybrid Vehicles
Geothermal
Sustainability
Energy Efficiency
Environmental Impacts & Global Climate Change
 
Home           About Us           Services           Projects           Contact Us           Resources           Site Map
Environmental Projects and Permitting Experience (continued)

Source Emissions Survey of Olokele Sugar Company, Ltd., Mill Bagasse Boiler Stack - Kaumakani, Kauai, Hawaii, September 9-11, 1981 (PM-HS)

Stack Emissions Skirmish Test of The Lihue Plantation Company, Ltd., Bagasse Boiler Stack - Lihue, Kauai, Hawaii, conducted March 26-27, 1981 (PM-HS)

Stack Gas and Particulate Emissions Testing for Biomass- and Coal-Fired Boilers, Various (PM-HS, Rep)

Stack Gas Vorticity and Velocity Determination for The Lihue Plantation Company, Ltd., Number 2 Scrubber - Lihue, Kauai, Hawaii, December 2, 1981 (PM-HS)

Waialua Sugar Company, Inc., Bagasse Drier Evaluation Study - Waialua, Oahu, Hawaii, June 1981 (PM-HS for stack sampling portion of test)

Water Quality

Bachelor of Science Degree in Environmental Technologies and Urban Systems (emphasis on water quality) (Educ)

Demonstration of a Cost-effective Digester Gas Utilization System, Consisting of a Generator to Produce Electricity from Digester Gas, at the Kailua Municipal Wastewater Treatment Plant (PM-D)

Evaluate the Potential of Biogas Production and Waste Treatment Via Anaerobic Digestion of Stillage (a By-product of Ethanol Production) (SA, EA)

Production of Methane Utilizing Anaerobic Treatment of Sugar Industry Wastewater (PM-D)

Permitting

Drafted, prepared and presented testimony, and achieved passage of legislation to require priority processing of State and county permits for renewable energy projects such as SWAC (Con, Leg)

Met with permitting agencies' staffs (Con)

Prepared an RFP and RFQ to select HSWAC’s permit manager - The Environmental Company (TEC) and worked closely with TEC to identify permitting requirements, to participate in public outreach initiatives, and to participate in meetings with county, State, and federal agencies that deal with the Project (Con)
Next Page      1 | 2 | 3 | 4      Previous Page
Key
© 2010 - 2011  Rezachek & Associates  |  All Rights Reserved  |  drezachek @ sustainablehawaii.com